Category
Construction (18)Engineering (11)Crafts (11)Textiles (9)Manufacturing (6)Architecture (6)Logistics (5)Transportation (3)Safety (3)Maintenance (3)Maritime (3)Infrastructure (2)Art (2)Weather (2)Shipping (2)Aesthetics (1)Recreation (1)Travel (1)Emergency (1)Factory (1)Sustainability (1)Entertainment (1)Fantasy (1)Innovation (1)History (1)Inspection (1)Manual Labor (1)Machinery (1)Warehouse (1)Accident (1)Demolition (1)Industrial (1)Disaster (1)Industry (1)
Usage Examples
Filter by Meaning The construction workers lifted the heavy girders into place with a crane.
The construction workers lifted the girders into place to support the new bridge.
The crane lifted the girders high into the air before carefully lowering them into place.
The steel girders for the skyscraper were delivered last week.
The weaver used a pick-up stick to manipulate the warp threads held by the girders into intricate patterns.
The weaver used a shuttle to pass the weft thread through the warp threads held by the girders.
The girders were spaced a certain distance apart to create the desired weave pattern.
The girders on the loom were carefully adjusted to ensure even tension on the warp threads.
The weaver carefully wound the warp threads onto the girders of the loom.
The girders on the loom had to be strong enough to withstand the tension of the warp threads during weaving.
The loom's girders were easily removable, allowing the weaver to change out the warp threads for different colors or materials.
The girders on the loom were made of durable materials such as metal or hardwood to ensure long-lasting use.
The weaver used a beater to push the weft threads against the warp threads held by the girders.
The weaver used a comb to pack down the weft threads after passing them through the girders.
The girders on the loom were carefully sanded and polished to prevent the warp threads from snagging or breaking.
The weaver threaded the warp through the girders of the loom.
The weaver tied off the warp threads at the ends of the girders to prevent them from unraveling.
The girders on the loom were adjustable, allowing the weaver to create different patterns and textures in the fabric.
The workers were installing the girders for the new building's second floor.
The new bridge design called for cantilevered girders to support the roadway.
The old bridge collapsed because the girders supporting the deck were corroded.
The architect decided to use steel girders to support the massive glass ceiling.
The weight of the heavy machinery caused one of the girders to bend.
The workers painted the girders to match the color of the building.
The girders were painted with a special coating to prevent rust and corrosion.
The weight of the heavy machinery caused the girders to bend and buckle.
The dockworkers used the girders to move the cargo into position for loading.
The large girders were necessary to support the weight of the heavy machinery being loaded.
The girders were carefully arranged to distribute the weight of the cargo evenly.
The girders were inspected regularly to ensure they were in good condition.
The girders were used to lift the cargo onto the ship.
The crane operator expertly maneuvered the girders to unload the containers.
The museum's glass roof was supported by a network of girders that created a stunning visual effect.
The girders on the suspension bridge had to be specially designed to withstand the high winds.
Post a Comment