Log InSign Up

Girders

134 Sentences | 8 Meanings

Usage Examples

Filter by Meaning
The crane could not be operated until the girders were properly inspected and deemed safe.
The design of the girders allowed for a wider bridge span than previously possible.
The loom's girders were spaced at even intervals to ensure consistent tension on the warp threads.
The warp threads on the girders had to be aligned precisely to create a clean, straight edge on the finished piece.
The girders were painted bright yellow so that they would be easy to spot from a distance.
The girders were assembled on site to form the skeleton of the bridge.
The construction workers needed to carefully maneuver the girders into place before attaching the crane.
The workers lifted the heavy girders into place using a crane.
The loom's girders were made of sturdy wood to withstand the strain of weaving.
The engineer designed the bridge's girders to withstand high winds and heavy traffic.
The new office building featured sleek, modern girders that added to its futuristic design.
The old steel girders of the abandoned factory had become a popular spot for urban explorers.
The firefighters had to cut through the girders to rescue the trapped workers.
The crane operator carefully lowered the heavy girders into place.
The architects designed the building with exposed girders for an industrial aesthetic.
The railway bridge was reinforced with additional girders to withstand heavy loads.
The construction company used cranes to hoist the girders into place.
The bridge was built with heavy-duty girders to support the weight of the vehicles.
The metal girders of the old factory creaked in the wind.
The construction workers installed the girders for the new skyscraper.
The factory used prefabricated girders to speed up the construction process.
The welding team was responsible for joining the girders together securely.
The workers placed wooden boards on top of the girders to provide a safe walking surface.
The crane operator expertly navigated the machinery around the girders.
The site manager inspected the girders before allowing the crane to lift the load.
The crane operator hoisted the heavy girders up to the top floor of the skyscraper.
The project manager ordered a shipment of girders to be delivered to the construction site.
The old factory was torn down, and the girders were salvaged for use in other projects.
The factory used steel girders to create a sturdy frame for the massive machines.
The girders had to be reinforced with extra steel to withstand earthquakes.
The construction crew welded the girders together to create the skeletal structure of the building.
The architect designed the building with several steel girders for added support.
The weight of the load-bearing girders required specialized equipment to transport and install.
The architects designed the building with extra-strong girders to withstand earthquakes.
The new warehouse featured girders that were painted bright yellow for safety reasons.
The architect envisioned a beautiful glass building supported by elegant girders.
The bridge collapsed because the girders were not strong enough to handle the load.
The bridge collapsed because the girders were not installed properly.
The demolition crew used a blowtorch to cut through the girders and dismantle the old factory.
The engineer calculated the weight-bearing capacity of the girders to ensure safety.
The building inspector checked the quality of the girders before issuing a permit for construction.
The girders on the loom were raised and lowered to create different shed heights for weaving.
The weaver used a heddle to lift and lower the warp threads held by the girders.
The novice weaver struggled to keep the warp threads from tangling on the girders.
The maintenance crew painted the rusted girders of the bridge to prevent further deterioration.
The rusty girders of the old bridge were replaced with new ones.
The construction crew welded the girders together to form the bridge's framework.
The construction workers laid the girders across the river to build the bridge.
The truck carrying the girders to the construction site had to take a longer route due to low overpasses on the original route.
The construction company ordered custom-made girders for the project to ensure they would fit precisely.
1 to 50 of 134 Sentences
Post a Comment
Ratings
3.0 out of 5
1 global rating
Related
Word Of The Day December 17, 2024
50,375
Total Words
34
Published Today
Sentence Copied!